Posts

Showing posts from January, 2012

PE COATING PIPE (Material : SUS)

Image
Product Name : Polyethylene Coating Pipe(SUS) Use : Tank Top Unit  Size : 54"                               Product Name : Polyethylene Coating Pipe(SUS) USE : Floating Dock pipe line Size : 1~10" Homepage : www.samkunok.com 

GAS PIPE (TOTAL CLOV 6049)

Image
HOMEPAGE : www.samkunok.com

METALIZING PRODUCT ( BEARING HOUSING & MAIN FRAME )

Image
PRODUCT NAME : NORWIN BEARING HOUSING 0.75 MW PRODUCT NAME : NORWIN MAIN FRAME 0.75 MW

RUBBER LINING ( WASTE WATER TANK, WATER-STRAINER, DOSING TANK)

Image
 PRODUCT NAME : WASTE WATER TANK    SIZE                   : 1309W X 1709L X 1659H                                      PRODUCT NAME : WATER - STRAINER                                     SIZE                   : 10K - 1200 A PRODUCT NAME : NaOH Dosing Tank SIZE            : Ã˜968 X 1782L HOMEPAGE : www.samkunok.com 

APPROVAL OF ARA PLASMA Ballast system

Image
Homepage : www.samkunok.com 

ARA PLASMA BWTS(BWMS) Strong Point

Image
Homepage : www.samkunok.com 

ARA PLASMA BWTS manufactured by SAMKUN CENTURY (BWTS,BWMS)

Image
ARA PLASMA BWTS (Ballast Water Treatment System) Ballast Water is taken on board to achieve the required safe operating conditions, this includes keeping the ship deep enough in the water to ensure efficient propeller and rubber operation and to avoid the bow emerging from the water, expecially in heavy sea. According to the result of IMO(International Maritime Organization), More than 3~5 billion tons of seawater and 7 thousands of aquatic species are carried in ship's ballast water each year. The introduction and spread of alien invasive species is a serious problem that has ecological, economic, health and environmental impacts, including loss of native biological diversity. It is mandatory for ships to install Ballast water treatment unit to remove aquatic species and viruses in ballast water by using chemical, Ozone, and electricity. ARA PLASMA BWTS was developed to prevent movement of marine life, it physically disinfect the marine life in bal

PE & PA COATING PROCESS

Image
1. Warehousing inspection shall be conducted by Quality assurance team. 2. Surface preparation 1) Prior to coating, the surface of prefabricated pipes shall be shot blast cleaned to remove     mill scale, rust and other foreign substances. 2) After blast cleaning, all lose abrasive and dust shall be removed from the surface by     brushing or air blowing. 3. Heating 1) Furnace heating     The heating temperature depends on the wall thickness of the pipe. 2) The heating temperature lays between 250degree ~ 480 degree. 4. PE/PA coating 5. Cooling     The coated pipes are hung up for air-cooling. 6. Inspection and Test     The inspection and tests for the coated pipe shall be carried out  as follows.     1) Flat test 2) Pin hole test 3) Impact test 4)Bending test 5) Adhesive test 7. Painting 8. Packing  Homepage : www.samkunok.com 

Samkun Century was awarded "Copper Prize" as an excellent cooperative company

Image
Samkun Century was awarded "Copper Prize" as an excellent cooperative company with DSME(Dawoo Shipbuilding & Marine Engineering) on 9th Jan. 2012 as a pattern for other companies. Samkun Century had a record of award " Sukryujang Prize" on Feb.2010. This prize has shown again our close cooperation with shipyard and quality management.   Homepage : www.samkunok.com 

PE Coating Application ( Stirrer, Strainer)

Image
                                               1) Product Name      :  Stirrer                                                2) Size                     :  16"                                                                                    1) Product Name   :  Water Strainer                                          2) Size                  :  18"                                          3) Use                  :   Water Strainer for Ship                                          4) Project             : H4045     Homepage : www.samkunok.com 

PE LINING PIPE

Image
                                            1)Product Name : Polyethylene Lining Pipe                                             2) Project            :  H 5336                                             3) Use                 :  TANK TOP Unit for Ship                                             4) Size                 :    30"                                                                                  1) Product Name :  Polyethylene Lining Pipe                                            2) Project            :  H 4225                                            3) Use                 :  TANK TOP Unit for Ship                                            4) Size                 :  40" *  7861mm                                                            Homepage : www.samkunok.com 

MATALIZING HUB manufactured by SAMKUN CENTURY

Image
                                           METALIZING HUB  manufactured by SAMKUN                                  Hub is the central part of Blade of  0.75MW Wind Power Generator .                                     Homepage : www.samkunok.com 

INTERNAL AND EXTERNAL PE COATED PIPES

Image
                                                                          INTERNAL & EXTERNAL PE CAOTED PIPES (manufacted by SAMKUN)                            INTERNAL & EXTERNAL PE CAOTED PIPES (manufacted by SAMKUN)                                                         Homepage : www.samkunok.com