Posts

APPROVAL OF ARA PLASMA Ballast system

Image
Homepage : www.samkunok.com 

ARA PLASMA BWTS(BWMS) Strong Point

Image
Homepage : www.samkunok.com 

ARA PLASMA BWTS manufactured by SAMKUN CENTURY (BWTS,BWMS)

Image
ARA PLASMA BWTS (Ballast Water Treatment System) Ballast Water is taken on board to achieve the required safe operating conditions, this includes keeping the ship deep enough in the water to ensure efficient propeller and rubber operation and to avoid the bow emerging from the water, expecially in heavy sea. According to the result of IMO(International Maritime Organization), More than 3~5 billion tons of seawater and 7 thousands of aquatic species are carried in ship's ballast water each year. The introduction and spread of alien invasive species is a serious problem that has ecological, economic, health and environmental impacts, including loss of native biological diversity. It is mandatory for ships to install Ballast water treatment unit to remove aquatic species and viruses in ballast water by using chemical, Ozone, and electricity. ARA PLASMA BWTS was developed to prevent movement of marine life, it physically disinfect the marine life in bal

PE & PA COATING PROCESS

Image
1. Warehousing inspection shall be conducted by Quality assurance team. 2. Surface preparation 1) Prior to coating, the surface of prefabricated pipes shall be shot blast cleaned to remove     mill scale, rust and other foreign substances. 2) After blast cleaning, all lose abrasive and dust shall be removed from the surface by     brushing or air blowing. 3. Heating 1) Furnace heating     The heating temperature depends on the wall thickness of the pipe. 2) The heating temperature lays between 250degree ~ 480 degree. 4. PE/PA coating 5. Cooling     The coated pipes are hung up for air-cooling. 6. Inspection and Test     The inspection and tests for the coated pipe shall be carried out  as follows.     1) Flat test 2) Pin hole test 3) Impact test 4)Bending test 5) Adhesive test 7. Painting 8. Packing  Homepage : www.samkunok.com 

Samkun Century was awarded "Copper Prize" as an excellent cooperative company

Image
Samkun Century was awarded "Copper Prize" as an excellent cooperative company with DSME(Dawoo Shipbuilding & Marine Engineering) on 9th Jan. 2012 as a pattern for other companies. Samkun Century had a record of award " Sukryujang Prize" on Feb.2010. This prize has shown again our close cooperation with shipyard and quality management.   Homepage : www.samkunok.com 

PE Coating Application ( Stirrer, Strainer)

Image
                                               1) Product Name      :  Stirrer                                                2) Size                     :  16"                                                                                    1) Product Name   :  Water Strainer                                          2) Size                  :  18"                                          3) Use                  :   Water Strainer for Ship                                          4) Project             : H4045     Homepage : www.samkunok.com 

PE LINING PIPE

Image
                                            1)Product Name : Polyethylene Lining Pipe                                             2) Project            :  H 5336                                             3) Use                 :  TANK TOP Unit for Ship                                             4) Size                 :    30"                                                                                  1) Product Name :  Polyethylene Lining Pipe                                            2) Project            :  H 4225                                            3) Use                 :  TANK TOP Unit for Ship                                            4) Size                 :  40" *  7861mm                                                            Homepage : www.samkunok.com